Kataiya Small Hydel Project (4 x 4.8 MW )

 

 

 

 
line decor
  
line decor

Salient features

 

Kataiya Hydroelectric project envisages to utilize the existing fall at RD-12 on Kosi Eastern Canal system for generation of hydroelectric project.

 

Location :-       Kataiya, Birpur, Distt. –Supaul

Block       -           Basantpur
District      -          Supaul

3.         Salient features :-
a)         Installed capacity                    -           4 x 4.8 MW
b)         Head                                       -           20 ft.
c)         Design discharge                    -           3670 cusec
d)         Annual Energy Generation     -           99 MU

Turbine :-         Horizontal bulb type/tubular type Kaplan
Rated output   -           7550 HP
Effective Head -           20

Generator:-     Synchronous Generator,
Generating voltage     -           6.6 KV
Rated output               -           5647 KVA       

 

 

***